Loading property data...

Property Details

Loading...

Lot Size The total area of your land parcel from the registered survey (Title/DP).

--

Height Limit Maximum building height from ground to roof peak. Set by LEP (NSW), Planning Scheme (VIC), or QDC (QLD).

--

FSR Floor Space Ratio. Multiply by lot size to get max floor area. E.g., 0.5:1 on 700m² = 350m² max floor space.

--

Min Lot Size Minimum lot size required for subdivision (Torrens title). Your lot must be 2× this to subdivide into 2 lots.

--

Loading...

-- --

CONSTRAINTS

What this means

-- --

Loading zone information...

What the free data shows

The zoning and lot size below set which development options are worth checking. None of them is confirmed until the council controls are verified.

But you'll want to verify these first

The title search reveals things that could change the picture:

  • Easements: where exactly you can't build
  • Covenants: restrictions that may limit secondary dwellings
  • Rights of way: how much usable space you really have

Better to know now than after spending $5k+ on architect drawings.

Planning controls from LEP and DCP will appear here...

Easement information requires an Investigation report.

Know before you commit

You wouldn't buy without a pest inspection. Why develop without understanding what's on your title, what the council will allow, and what you could actually build?

Title & encumbrance analysis
Planning controls & overlays decoded
Development options with approval pathways

Everything in Investigation, plus 88B Instrument decoding, S10.7 Certificate, covenant enforceability review, and a recommended approval pathway (CDC or DA) — the full brief for your architect or planner.

Title Analysis

Your title searched and decoded — easements, covenants, mortgages, restrictions. Every item in Schedule 2 explained.

Easements Covenants Restrictions

What it is · Why it matters · What to do about it

Planning Controls

Your zone, FSR, height limits, DCP controls — cross-referenced against your lot to show what's actually buildable.

Zone Analysis FSR Calculation Setbacks Overlays

Every control checked · Clear impact assessment

What Could You Build

Development options assessed against YOUR property — with likelihood ratings, CDC vs DA pathways, and estimated timelines.

Dual Occupancy Secondary Dwelling Subdivision Extension

Feasibility ratings · Approval pathways · Next steps

Your Action Plan

Clear next steps tailored to your property — who to talk to, what to order, where to start.

Try our Development
Calculator

You decide the quality and finishes,
we confirm the costs.

Try for free

Extension Feasibility

Example: not your property

Total Project Cost

$515,286

Cost per m²

$9,521

Cost Breakdown

Construction
50m² total
$385,250
Second storey
50m²
$385,250
DA/CDC fees $5,000
Structural engineering $4,000
Temporary accommodation $0